Electrician skills test: a 30-minute bench test for new hires
An electrician skills test you can run in 30 minutes: bending, a planted fault, terminations, prints and safety, with the offset math and a scoring sheet.
A good electrician skills test takes 30 minutes at a bench with a hand bender, a meter and one print. Have him bend an offset and a 90, find a fault you planted in a control circuit, terminate and torque, answer five questions off one print, and talk through what he'd check before energizing. Score it on one sheet, give every applicant the same test, and keep it de-energized or low-voltage.
This is the hands-on step in the full process for hiring a journeyman who can do the work.
01Why a bench test beats a quiz
A bench test shows you his hands, and a quiz only shows you his memory. The federal Office of Personnel Management says that on work sample tests, "performance on the tests relates highly to performance on the job" (OPM).
The online electrician tests that come up first in a search are multiple-choice quizzes. They can tell you whether a man studied, and that's about it. One national electrical contractor told us they kept getting "so-called journeymen that can't bend conduit... They're basically laborers." Five minutes with a hand bender catches that.
A commercial contractor told us the same in October 2026. His bar for an apprentice is two years in, able to bend pipe and read plans. Applicants who claim it come in for the second interview, and he hands them a piece of pipe. Some ask, "What would you like me to do with this?" Why agencies keep sending those hands is its own post: why staffing agencies send journeymen who can't bend pipe.
02The 30-minute layout
Set up five stations on one bench and run them in order. One way to lay it out, not an industry standard:
| Station | Time | Task |
|---|---|---|
| 1. Bend | 8 min | 1/2" EMT, hand bender: one offset over a set obstacle, one 90 to a mark |
| 2. Troubleshoot | 10 min | 3-way and 4-way lighting circuit plus a contactor, one planted fault |
| 3. Terminate and mount | 5 min | Land and torque conductors on a lug, mount a weatherproof box |
| 4. Prints | 5 min | One sheet, five questions |
| 5. Walk-through | 2 min | "What do you check before you energize this?" |
That's 30 minutes (8 + 10 + 5 + 5 + 2). Have the foreman who'd run him watch and score.
03Station 1: the conduit bending test
Bending is the fastest way to tell a journeyman from a laborer. A real hand measures, marks and bends without stopping to think about which way the arrow goes.
Before the bench, the 60-second check. Hand him a stick of EMT and a bender and say, "Give me a 12-inch stub-up." Nothing else. A two-year hand picks up the bender and finds his mark. If he asks what you want him to do with it, you can thank him and skip the other 29 minutes.
Set up: a 10-foot stick of 1/2-inch EMT, a 1/2-inch hand bender, a tape, a marker, a torpedo level, and a block or a piece of strut screwed to a board as the obstacle.
Task A, the offset. Ask for an offset that clears the obstacle and lands back on the floor line. Let him pick the angle. Many hands pick 30 degrees for a small offset because the multiplier is 2.
He should know the math cold, rounded the way the trade carries it:
| Angle | Multiplier | Shrink per inch of offset |
|---|---|---|
| 10° | 6 | 1/16" |
| 22.5° | 2.6 | 3/16" |
| 30° | 2 | 1/4" |
| 45° | 1.4 | 3/8" |
| 60° | 1.2 | 1/2" |
Worked example: a 6-inch offset at 30 degrees puts the marks 12 inches apart (6 x 2), and the pipe shrinks 1-1/2 inches (6 x 1/4). He should add that shrink to his measurement so the offset lands where it's supposed to.
Task B, the 90. Ask for a 12-inch stub-up. He reads the take-up off the bender you hand him. Say it's 5 inches: he marks the pipe at 7 inches (12 minus 5) and lines it up with the bender's arrow. Then he checks it with the level.
What good looks like:
- He measures and marks before the first bend, not after.
- Both offset bends are the same angle, and the rise is within about 1/4 inch of target.
- The pipe lies flat on the floor. No dog-leg.
- The 90 is plumb on the level and the stub is within about 1/4 inch.
- No kinks or flattened pipe.
Red flags: he bends first and measures after, asks which mark lines up with the arrow, lines up the wrong end of the bender, or reaches for a phone app for a 30-degree multiplier. On this test, you want to know whether he knows it cold.
The 1/4-inch tolerance is our suggestion, not a code rule. Set yours and use it for everyone.
04Station 2: the planted fault
The troubleshooting station shows how he thinks. A contractor on the Mike Holt forum laid out the idea years ago: wire up a couple of 3-ways and 4-ways and a contactor, then "stick a piece of paper between the contacts or cut the wire an just stick it under the screw." Put "a meter, screwdriver, wire strippers on the table" and "watch them work" (Mike Holt Forum).
Build the board once. Run it de-energized or on a low-voltage control transformer, never line voltage. Rotate two or three faults so word doesn't get around.
What good looks like: he checks his meter first, starts from the source and works out in order, talks through what he expects to read before he reads it, and finds it without swapping parts.
Red flags: random poking, swapping the contactor before testing anything, or no plan he can explain.
05Station 3: terminate, torque and mount a box
This station takes five minutes and catches sloppy hands fast. Give him a breaker or a mechanical lug, a few lengths of THHN in two sizes, strippers, a torque screwdriver or wrench, and a weatherproof box with a scrap of plywood to mount it on.
What good looks like: strip length matches the lug, no nicked strands, no insulation under the lug, and he looks for the torque value on the label and uses a torque tool to hit it. NEC 110.14(D) requires terminals to be tightened to the torque value on the equipment or in the maker's instructions, and the code expects a torque tool or another approved means to hit it. The exact wording changed between editions, so check the one your inspector enforces. If he cranks it "good and tight" by feel, that's a red flag.
The box: he should fasten it through its mounting tabs and leave the back whole. One small shop owner told us a tryout hand screwed a weatherproof box to the wall "straight through the box. Just didn't use the tabs." A hole in the back of a box built to keep water out lets water in.
06Station 4: one print sheet
Print reading is the "point A to point B" test. Pick one real sheet from a past job: a plan with a panel schedule, or a one-line. Ask five questions:
- How many circuits are on this panel, and how many are spares?
- Where does the homerun for this circuit land?
- What feeds this panel, and from where?
- What does this symbol mean?
- Is anything on this sheet missing or in conflict?
What good looks like: he reads the legend and notes first and asks a question or two. Guessing is a red flag.
07Station 5: the energize walk-through
This two-minute question shows whether he'll get someone hurt. Point at the board from station 2 and ask, "What do you check before you energize this?"
A good answer covers lockout and tagout, verifying dead with a checked meter, torque, covers, grounding and who's clear. OSHA's general industry rule has a qualified person use test equipment to verify a circuit is de-energized, including a check for backfeed (OSHA 1910.333).
08The scoring sheet
Score each station 1 to 5 right after he finishes it. Write down what a 1, 3 and 5 look like before the first applicant, so two scorers land in the same place:
| Station | 1 | 3 | 5 |
|---|---|---|---|
| Bend | Couldn't lay it out | Got there with a redo or a hint | Clean, on target, no hesitation |
| Troubleshoot | No method | Found it slowly or with a hint | Found it in order and explained it |
| Terminate and mount | Wrong strip, no torque, screwed through the box | Neat, but skipped the label | Torque tool to the label, box on its tabs |
| Prints | Couldn't find the circuit | 3 of 5 right | 5 of 5, asked a good question |
| Walk-through | Missed verify dead | Covered most of it | Lockout, verify dead, torque, covers, clear |
Here's an example pass mark, not a standard: 18 out of 25, with no score of 1 on the walk-through. A 1 on safety is a no, no matter how well he bends.
Keep the score sheet with his application for at least a year. That's the federal record-keeping floor for hiring records (FTC and EEOC).
If you've got more work than guys, see the electricians we already have near you. No money up front. If you don't hire, you don't pay.
09How to run it without insulting a real journeyman
A good journeyman will take a fair test and walk out of a stupid one:
- Tell him on the phone screen that there's a 30-minute bench test and what's on it. No surprises. (The rest of that call is in journeyman phone screen questions.)
- Keep it to 30 minutes. He has a job.
- Let him use his own bender if he brings one.
- No trick questions. Ask "What is the bend multiplier for 30 degrees?", the plain wording forum hands suggested to one shop, not a word problem (Mike Holt Forum).
- Score the work, then talk. A hand who's been running gear for two years might be rusty on a 3-way. Ask before you mark him down.
Then go straight to the interview while he's there. The questions are in journeyman electrician interview questions to ask. What to look for in the first week after you hire him is in what a journeyman should do on day one.
If you hire a lot of journeymen and want a third-party check, NCCER runs knowledge assessments and performance verifications (NCCER).
10The rules: same test, safe bench, fair pay
Rules vary by state and city, so check anything unusual with your employment lawyer.
Same test for everyone. The EEOC says giving a test to some applicants and not others because of race, color, religion, sex or national origin is intentional discrimination. And a test that screens out one group at a higher rate has to be "job-related and consistent with business necessity" (EEOC). A bending and troubleshooting test for a journeyman who'll bend and troubleshoot is about as job-related as it gets.
De-energized or low-voltage only. He isn't your employee yet and he doesn't know your board. No line voltage on the bench, safety glasses on, and the foreman watching.
Pay for it if it runs long or is real work. A 30-minute bench test on scrap pipe is a test. A day pulling wire on your job is work. Federal wage law counts work an employer "suffered or permitted" as hours worked (DOL Fact Sheet #22), and state rules on tryouts vary. If the test turns into production, or you want a paid trial day, put him on the payroll for it.
Score a trial day like the bench. That same tryout hand climbed out of a trench rather than shovel the last few feet, and packed up at dusk two hours from the shop. Pass or fail each of these:
- Boxes, straps and supports go on the way the maker intended.
- He does the job's grunt work when it needs doing, shovel included.
- He stays until the work is safe to leave, even past dark.
- He's on time, and in this trade on time means early.
Got more work than guys?
We already found them: 264 qualified electricians, 5+ years each. See who we have near you. No money up front. If you don't hire, you don't pay.
See who we haveFAQFAQs
Should I give electricians a skills test before hiring?
Yes, for any journeyman you'll pay to run work. A license shows he passed an exam and logged hours. A 30-minute bench test shows whether he can bend, terminate, read prints and troubleshoot.
What's on a conduit bending test?
Usually an offset to clear an obstacle and a 90 to a set stub height, in 1/2-inch EMT with a hand bender. Some shops add a kick or a 3-point saddle. You're watching whether he measures and marks before he bends, uses the right multiplier and shrink, and keeps the pipe free of dog-legs.
Do I have to pay an applicant for a skills test?
It depends on the test and your state. A short bench test on scrap is different from a trial day on a live job, which federal law treats as hours worked. When in doubt, pay him, and check with your employment lawyer.
What's a quick way to check an applicant who claims two years?
Hand him a stick of EMT and a bender and ask for a 90. A hand with two years in starts measuring. One who asks what you want him to do with it hasn't bent much pipe.
Sources
- U.S. Office of Personnel Management, Work Samples and Simulations
- U.S. EEOC, Employment Tests and Selection Procedures
- FTC and EEOC, Background Checks: What Employers Need to Know
- U.S. Department of Labor, Fact Sheet #22: Hours Worked Under the FLSA
- OSHA, 29 CFR 1910.333, Selection and use of work practices
- NCCER, Assessments (National Craft Assessment and Certification Program)
- Mike Holt Forum, Electrician Interviews (2008)
- Mike Holt Forum, Journeyman Applicant Quiz (2017)